Géotechnique | Essai œdométrique (1) : présentation
| Action | Key |
|---|---|
| Play / Pause | K or space |
| Mute / Unmute | M |
| Toggle fullscreen mode | F |
| Select next subtitles | C |
| Select next audio track | A |
| Toggle automatic slides maximization | V |
| Seek 5s backward | left arrow |
| Seek 5s forward | right arrow |
| Seek 10s backward | shift + left arrow or J |
| Seek 10s forward | shift + right arrow or L |
| Seek 60s backward | control + left arrow |
| Seek 60s forward | control + right arrow |
| Seek 1 frame backward | alt + left arrow |
| Seek 1 frame forward | alt + right arrow |
| Decrease volume | shift + down arrow |
| Increase volume | shift + up arrow |
| Decrease playback rate | < |
| Increase playback rate | > |
| Seek to end | end |
| Seek to beginning | beginning |
Download links
HLS video stream
You can use an external player to play this stream (like VLC).
HLS video streamWhen subscribed to notifications, an email will be sent to you for all added annotations.
Your user account has no email address.
Information on this media
L’essai œdométrique analyse la consolidation d’un sol, c’est-à-dire son tassement sous charge. Il évalue le tassement maximal induit par une construction et mesure la vitesse à laquelle l’eau quitte le sol, cause principale du phénomène. L’essai permet ainsi de déterminer la cinétique de tassement et d’estimer le temps nécessaire — quelques mois par exemple — pour atteindre une proportion donnée du tassement final.
The oedometer test examines soil consolidation, meaning settlement under applied loads. It determines the maximum settlement caused by a structure and measures the rate at which water escapes from the soil, driving the process. The test establishes settlement kinetics and estimates the time required—several months, for instance—to reach a given percentage of the final settlement.
Other media in the channel "Essais oedométrique, pressiométrique et triaxial"
951 views, 5 this year, 1 this monthGéotechnique | Essai pressiométrique (1) : présentationSeptember 12th, 2022
2596 views, 286 this year, 66 this monthGéotechnique | Essai œdométrique (2) : mise en œuvreNovember 24th, 2020
2604 views, 292 this year, 49 this monthGéotechnique | Essai triaxial (2) : mise en œuvreNovember 24th, 2020
1750 views, 4 this year, 1 this monthGéotechnique | Essai pressiométrique (3) : exploitation de l'essaiNovember 23rd, 2020
1722 views, 11 this year, 2 this monthGéotechnique | Essai pressiométrique (2) : mise en œuvreNovember 23rd, 2020
2491 views, 322 this year, 65 this monthGéotechnique | Essai œdométrique (3) : exploitation de l'essaiNovember 20th, 2020